Painting — DFW

Interior & exterior painting.
Quoted by the square foot.

Professional prep, premium paint, clean lines — quoted by the square foot with paint brand, sheen, and surface scope stated upfront. No vague per-room estimates that change at the door.

Interior — Standard Grade
$1.90/sq ft
Of living area · Sherwin-Williams ProMar · Excludes trim
Interior — Premium Grade
$2.40/sq ft
Duration or Emerald line · Better coverage, washable
Exterior — Standard
$2.10/sq ft
Of living area · Sherwin-Williams exterior · Single story
Trim & Doors Add-On
$150/room
Baseboards, door casings, crown if present
Get Your Painting Quote

Stated painting pricing starts here.

Enter your project details for an instant Planning Range. A formal written quote follows after review.

EPA Lead RRP rules may apply to pre-1978 homes. We confirm before quoting any painting scope.
🔒 Your information is not for sale. Used only to prepare and send your formal quote. Not shared or sold.
Scope & Exclusions

What's in. What's out. What triggers a change order.

✓ Included by Default — Interior
  • Walls — stated rooms and surfaces
  • Ceilings — if included in quote
  • Two coats per surface unless stated otherwise
  • Primer coat where required by color change or condition
  • Basic surface prep — light sanding and filling minor holes
  • Paint brand, product line, and sheen stated in quote
  • Color per stated Sherwin-Williams name and SW code
✕ Excluded Unless Stated
  • Cabinet painting or refinishing
  • Wallpaper removal or wall repair beyond minor prep
  • Specialty finishes — faux, texture, Venetian plaster
  • Garage floor epoxy or concrete coating
  • Trim and doors (unless included in quote)
  • Exterior deck staining or fence painting (quoted separately)
  • Color changes requiring more than two coats
  • Lead-safe work practices for pre-1978 homes (priced separately)
The operating rule: Exact color by Sherwin-Williams name and SW code must be confirmed before work begins. If it's not in writing, it's not in the project. Changes require a written change order — approved before work changes.