Flooring — DFW

Flooring installation.
Written price. All materials supplied.

LVP, hardwood, tile, and carpet — all Stated-supplied and warrantied end to end. Subfloor assumptions, demo, stairs, and moisture are all stated in your quote before you commit.

LVP — Material + Labor
$7.20/sq ft
Shaw, Mohawk, MSI · Excludes demo and stairs
Engineered Hardwood
$12.50/sq ft
Bruce, Shaw · Material + installation
Tile
$11.25/sq ft
Daltile, Marazzi, MSI · Floor and wall
Staircase Add-On
$1,000 each
Per staircase · Matching material where available
Get Your Flooring Quote

Stated flooring pricing starts here.

Enter your project details for an instant Planning Range. A formal written quote follows after review.

Measure each room and add them up. Don't include bathrooms unless tiling them.
All materials are Stated-supplied and warrantied. Specific selections confirmed in formal quote.
Unknown is common in pre-1990 DFW homes. We inspect and document before locking final price.
🔒 Your information is not for sale. Stated Homes does not sell, share, or distribute your contact information. Used only to prepare and send your formal quote.
Scope & Exclusions

What's in. What's out. What triggers a change order.

✓ Included by Default
  • Material supply — Shaw, Mohawk, MSI, Bruce, Daltile, Marazzi
  • Installation labor per stated method
  • Transition strips at doorways and flooring changes
  • Basic expansion gap and edge trim
  • Adhesive, underlayment, and installation consumables
  • Haul-off of demo material if demo is included
✕ Excluded Unless Stated
  • Subfloor leveling beyond minor self-leveling compound
  • Subfloor structural repair or replacement
  • Baseboard and shoe molding removal or replacement
  • Toilet removal and reset for bathroom tile
  • Moisture mitigation beyond stated allowance
  • Furniture move-and-reset beyond stated scope
  • Stairs beyond the number stated in quote
  • Custom inlays, medallions, or decorative patterns
The operating rule: If it is not expressly stated in your approved quote, it is not part of the project. Changes require a written change order before the work changes. No verbal agreements recognized.