Flooring installation. Written price. All materials supplied.
LVP, hardwood, tile, and carpet — all Stated-supplied and warrantied end to end. Subfloor assumptions, demo, stairs, and moisture are all stated in your quote before you commit.
Enter your project details for an instant Planning Range. A formal written quote follows after review.
1. Who we're quoting
2. Your flooring project
Measure each room and add them up. Don't include bathrooms unless tiling them.
All materials are Stated-supplied and warrantied. Specific selections confirmed in formal quote.
Unknown is common in pre-1990 DFW homes. We inspect and document before locking final price.
🔒 Your information is not for sale. Stated Homes does not sell, share, or distribute your contact information. Used only to prepare and send your formal quote.
Scope & Exclusions
What's in. What's out. What triggers a change order.
✓ Included by Default
Material supply — Shaw, Mohawk, MSI, Bruce, Daltile, Marazzi
Installation labor per stated method
Transition strips at doorways and flooring changes
Basic expansion gap and edge trim
Adhesive, underlayment, and installation consumables
Haul-off of demo material if demo is included
✕ Excluded Unless Stated
Subfloor leveling beyond minor self-leveling compound
Subfloor structural repair or replacement
Baseboard and shoe molding removal or replacement
Toilet removal and reset for bathroom tile
Moisture mitigation beyond stated allowance
Furniture move-and-reset beyond stated scope
Stairs beyond the number stated in quote
Custom inlays, medallions, or decorative patterns
The operating rule: If it is not expressly stated in your approved quote, it is not part of the project. Changes require a written change order before the work changes. No verbal agreements recognized.